| About
UCEMC Board Members Email Directory District Office Addresses Members Handbook Rules & Regulations Services Safety Rates Online Bill Presentation Related Links From the Manager's Desk... Frequently Asked Questions Site Map HOME |
Following is the schedule of Rules & Regulations for UCEMC: |
|
1. Application for Service. Each prospective Customer desiring electric service shall be required to sign Cooperative's standard form of application for service or contract before service is supplied by the Distributor. 2. Deposit. A deposit in accordance with Cooperative's standard policy may be required or shall apply, as described in Policy No. 5-13. 3. Point of Delivery. The point of delivery is the point, as designated by Distributor, on Customer's premises where current is to be delivered to building or premises. All wiring and equipment beyond this point of delivery shall be provided and maintained by Customer at no expense to Distributor. 4. Customer's Wiring - Standards. All wiring of Customer must conform to Distributor's requirements and accepted modern standards, as exemplified by the requirements of the National Electrical Safety Code, the National Electrical Code, and Tennessee Department of Insurance, Regulation 15. 5. Inspections. Distributor shall have the right, but shall not be obligated, to inspect any installation before electricity is introduced or at any later time, and reserves the right to reject any wiring or appliances not in accordance with Distributor's standards; but such inspection or failure to inspect or reject shall not render Distributor liable or responsible for any loss or damage resulting from defects in the installation, wiring, or appliances, or from violation of Distributor's rules, or from accidents which may occur upon Customer's premises. Cooperative will recognize electrical inspections performed by the electrical inspector of the State of Tennessee as being the authorized and recognized inspection agency. 6. Underground Service Lines. Customer desiring underground service lines from Distributor's overhead system must bear the excess cost incident thereto. Specifications and terms for such construction will be furnished by Distributor on request. 7. Customer's Responsibility for Distributor's Property. All meters, service connections, and other equipment furnished by Distributor shall be, and remain, the property of Distributor. Customer shall provide a space for and exercise proper care to protect the property of Distributor on its premises, and, in the event of loss or damage to Distributor's property arising from neglect of Customer to care for same, the cost of the necessary repairs or replacements shall be paid by Customer. 8. Right of Access. Distributor's identified employees shall have access to Customer's premises at all reasonable times for the purpose of reading meters, testing, repairing, removing, or exchanging any or all equipment belonging to Distributor. 9. Billing. Bills shall be rendered monthly in accordance with Cooperative's policy on billing as described in Policy No 73. 10. Discontinuance of Service by Distributor. Service will be discontinued in accordance with Policy No 100 on discontinuance of service. 11. Connection, Reconnection, and Disconnection Charges. Distributor may establish and collect standard charges to cover the reasonable average cost, including administration, of connecting or reconnecting service, as provided above. Higher charges may be established and collected when connections and reconnections are performed after normal office hours, or when special circumstances warrant. 12. Termination of Contract by Customer. Customers who have fulfilled their contract terms and wish to discontinue service may be required to give a least three (3) days written notice to that effect, unless contract specifies otherwise. Notice to discontinue service prior to expiration of contract term will not relieve Customer from any minimum or guaranteed payment under any contract or rate. 13. Service Charges for Temporary Service. Customers requiring electric service on a temporary basis may be required by Distributor to pay all costs for connection and disconnection incidental to the supplying and removing of service. This rule applies to circuses, carnivals, fairs, temporary construction, and the like. 14. Interruption of Service. Distributor will use reasonable diligence in supplying current, but shall not be liable for breach of contract in the event of, or for loss, injury, or damage to persons or property resulting from interruptions in service, excessive or inadequate voltage, single-phasing, or otherwise unsatisfactory service, whether or not caused by negligence. 15. Shortage of Electricity. In the event of an emergency or other condition causing a shortage in the amount of electricity for Distributor to meet the demand on its system, Distributor may, by an allocation method deemed equitable by Distributor, fix the amount of electricity to be made available for use by Customer and/or may otherwise restrict the time during which Customer may make use of electricity and the uses which Customer may make of electricity. If such actions become necessary, Customer may request a variance because of unusual circumstances including matters adversely affecting the public health, safety and welfare. If Customer fails to comply with such allocation or restriction, Distributor may take such remedial actions as it deems appropriate under the circumstances including temporarily disconnecting electric service and charging additional amounts because of the excess use of electricity. The provisions of the Section entitled Interruption of Service of this Schedule of Rules and Regulations are applicable to any such allocation or restriction. 16. Voltage Fluctuations Caused by Customer. Electric service must not be used in such a manner as to cause unusual fluctuations or disturbances to Distributor's system. Distributor may require Customer, at his own expense, to install suitable apparatus which will reasonably limit such fluctuations. 17. Additional Load. The service connection, transformers, meters and equipment supplied by Distributor for each Customer have definite capacity, and no addition to the equipment or load connected thereto will be allowed except by consent of Distributor. Failure to give notice of additions or changes in load, and to obtain Distributor's consent for same, shall render Customer liable for any damage to any of Distributor's lines or equipment caused by the additional or changed installation. 18. Standby and Resale Service. All purchased electric service (other than emergency or standby service) used on the premises of Customer shall be supplied exclusively by Distributor, and Customer shall not, directly or indirectly, sell, sublet, assigned, or otherwise dispose of the electric service or any part thereof. 19. Notice of Trouble. Customer shall notify Distributor immediately should the service be unsatisfactory for any reason, or should there be any defects, trouble, or accidents affecting the supply of electricity. 20. Non-Standard Service. Customer shall pay the cost of any special installation necessary to meet his peculiar requirements for service at other than standard voltages, or for the supply of closer voltage regulations than required by standard practice. 21. Meter Tests. Distributor will, at its own expense, make periodical tests and inspections of its meters in order to maintain a high standard of accuracy. Distributor will make additional tests or inspections of its meters at the request of Customer. If tests made at Customer's request show that the meter is accurate within two percent (2%) slow or fast, no adjustment will be made in Customer's bill, and Distributor's standard testing charge will be paid by Customer. In case the test shows meter to be in excess of two percent (2%) fast or slow, an adjustment shall be made in Customer's bill over a period of not over ninety (90) days prior to date of such test, and cost of making test shall be borne by Distributor. 22. Relocation of Outdoor Lighting Facilities. Distributor shall, at the request of Customer,relocate or change existing Distributor-owned equipment. Customer shall reimburse Distributor for such changes at actual cost including appropriate overheads. 23. Billing Adjusted to Standard Periods. The demand charges and the blocks in the energy changes set-forth in the rate schedules are based on billing periods of approximately one month. In the case of the first billing of new accounts (temporary service, cotton gins, and other seasonal customer excepted) and final billings, of all accounts (temporary service excepted) where the period covered by the billing involves fractions of a month, the demand charges and the blocks of the energy charge will be adjusted to a basis proportionate with the period of time during which service is extended. 24. Scope. This schedule of Rules and Regulations is a part of all contracts for receiving electric service from Distributor, and applies to all service received from Distributor, whether the service is based upon contract, agreement, signed application, or otherwise. A copy of this schedule, together with a copy of Distributor's Schedule of Rates and Charges, shall be kept open to inspection at the offices of Distributor. 25. Revisions. These Rules and Regulations may be revised, amended, supplements, or otherwise changed from time to time without notice, Such changes, when effective, shall have the same force as the present Rules and Regulations. 26. Conflict. In case of conflict between any provision of any rate schedule and the Schedule of Rules and Regulations, the rate schedule shall apply. |
|
|
|
Web site design by Mind's Eye Presentations. Copyright Mind's Eye Presentations. All rights reserved. Disclaimer